WaveWare Apollo T-2000 Technical Information Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 114
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
Certification Manual
- 29 -
and build a "fenced off area" around the wire box with your cart and ladder,
etc.
Firewall Penetrations
After all the wires have been pulled make sure that every penetration
though a fire or smoke wall has been treated with the approved fire stop.
Alliance usually uses a putty that is approved for this purpose although an
authorized caulk type fire stop is sometimes used as well. This is important
not only because of liability issues with our company or compliance to
regulations, but more importantly it inhibits the spread of flames through an
attic space should there be a fire.
Pulling Wire in New Construction
Advance Preparation
In many ways, pulling wires in new construction is easier than pulling
wire in an existing facility. The environment that the wires are being pulled
though is usually cleaner and more open at this time. However advance
preparation is still just as important in new construction as it is in an
existing building, maybe even more important. This is because other
trades are working at the same time or will come back to work at a later
stage, so we don't want to conflict with their requirements. It is important to
know what spaces you can use and what spaces other trades need.
Some key sources to gain this information include any knowledge
that you can glean from a pre-installation site inspection and visit with the
Building Supervisor. Be sure to ask about the locations of firewalls, attic
accesses and any special considerations. Consult the blueprints, drawings
and wire diagrams as well.