WaveWare Apollo T-2000 Technical Information Page 64

  • Download
  • Add to my manuals
  • Print
  • Page
    / 114
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 63
Certification Manual
- 64 -
description. Choose the proper escalation templates for each
shift and then click SAVE. When finished click DONE.
Programming Step 3 - Control Panel Configuration (Tools / Server / Device
Related / Control Panel Configuration)
- This screen allows the installer to configure the serial ports that are
used for any external devices the computer will be
communicating with. Click NEW and then label what the device
is and choose the proper Panel Type with its COM Port. Click
SAVE and DONE. NOTE, Concord Panels are always
programmed to panel type: “Advent”. WaveWare Paging
Encoders are always programmed to panel type: “Tapout”
Programming Step 4 – Points Configuration Screen (Tools / Server /
Device Related / Points Configuration)
- At this point, the installer is ready to setup the Points Configuration
Screen. This table is where all of the data that has been
entered in steps 1-3 is tied together and associated with the
zone numbers. The information that the software uses to page
out comes from columns 1 and 3. If there is no data in column
3, than column 1 is used. If there is data in column 3, column 1
is note used.
- Click NEW. The first column is the zone location or description.
The second column is the zone number. This data must be
unique for each zone, and each panel. For example, the when
Page view 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 113 114

Comments to this Manuals

No comments